Vision

Our vision is to create a better and environment
friendly life for the world.

Mission

To CREATE and PROMOTE SAFE, BETTER AND HEALTHY
Environment for the NEXT GENERATIONS.

Why Pre-processing Facility Needed?

  • Waste generally cannot be used directly for co-processing in cement kilns, but must undergo a pre-processing.
  • Cement plants need consistent supply of uniform quality of “Waste Material” as fuel.
  • Ensures consistent waste quality, consistent emission and uniform operation.
  • Technical Expertise and Safety Regulations.
  • Pre-processing is cost efficient, safe and environmentally preferred option compared to other waste treatment options.

Environmental Benefits Of Ppf

  • Diminution of environmental hazards (uncontrolled landfilling, soil and water pollution etc.)
  • Reduces greenhouse gas emissions, as the waste is used to reduce the use of fossil fuels.
  • Zero Residue generation.
  • Preserves non-renewable fossil fuels and natural resources as the energy and mineral value of the waste materials are recovered.
  • A healthier and cleaner environment.