Vision
Our vision is to create a better and environment
friendly life for the world.
Mission
To CREATE and PROMOTE SAFE, BETTER AND HEALTHY
Environment for the NEXT GENERATIONS.
Why Pre-processing Facility Needed?
- Waste generally cannot be used directly for co-processing in cement kilns, but must undergo a pre-processing.
- Cement plants need consistent supply of uniform quality of “Waste Material” as fuel.
- Ensures consistent waste quality, consistent emission and uniform operation.
- Technical Expertise and Safety Regulations.
- Pre-processing is cost efficient, safe and environmentally preferred option compared to other waste treatment options.
Environmental Benefits Of Ppf
- Diminution of environmental hazards (uncontrolled landfilling, soil and water pollution etc.)
- Reduces greenhouse gas emissions, as the waste is used to reduce the use of fossil fuels.
- Zero Residue generation.
- Preserves non-renewable fossil fuels and natural resources as the energy and mineral value of the waste materials are recovered.
- A healthier and cleaner environment.